Skip to content
Preparation

Preparing a site before line marking

Access, mowing and reference points to sort before we arrive — so the marking visit goes smoothly.

25 January 2025 4 min read

A marking visit takes a fraction of the time when the site is ready. Here's what to prepare before we arrive.

Mow the pitch first

Lines sit on top of the grass. If the grass is long, the paint lands on the leaf tips and gets cut off at the next mow. Always mow 24–48 hours before marking — the lines will be crisper and last longer.

Don't mow immediately after marking either. Give the paint 24 hours to settle into the sward before the next cut.

Clear the pitch

Remove goals, corner flags, cones, and any debris from the playing surface. The robot needs a clear path across the full pitch layout. If goals are fixed and can't be moved, let us know in advance — we'll work around them.

Check access

We need to get a vehicle to the pitch. Check that gates are unlocked, paths are clear, and there's parking available. If access requires carrying equipment across a distance, tell us beforehand so we can plan accordingly.

Reference points

If you have fixed goalposts or permanent reference markers, make sure they're visible. These help confirm the pitch alignment and that the layout matches your existing setup.

What if the pitch is wet?

Light rain is fine — the robot can mark in damp conditions. Standing water or saturated ground is a problem, both for the quality of the line and for getting vehicle access. If in doubt, we'll check the weather and advise whether to go ahead or reschedule.

A well-prepared site means a faster visit, better lines, and no wasted time. If you're unsure about anything, just ask when you book — we'll talk you through it.